Attach all shipments to a plan - Load Build Control (Employee)

To attach shipment legs to a plan, ensure there is a load plan to which you can attach the shipments. Your current load plan is the one to which the shipments areis attached. To be eligible to be added to your current plan, the division for the shipment must match the division for the current plan.

  1. Display the Load Build Control screen (Employee).
  2. Click Attach All to Current Plan under Shipment Leg Operations. A confirmation message may be displayed.
  3. If the message is displayed, click Yes. A message indicates the number of shipment legs that were successfully attached to the current plan.

See Also

Attach a shipment to a plan – Load Build Control (Employee)

Attach a shipment to a plan – List of Shipments (Employee)