Attach a shipment to a plan – Load Build Control (Employee)
To attach shipment legs to a plan, ensure there is a load plan to which you can attach the shipments. Your current load plan is the one to which the shipments areis attached. To be eligible to be added to your current plan, the division for the shipment must match the division for the current plan.
Click Load Build > Work with Plan > Control. The Load Build Control screen is displayed.
Click Attach under Shipment Leg Operations. The Attach Shipment To Plan screen is displayed.
Enter the required information.
Click Submit. A message indicates the number of shipment legs that were successfully attached to the current plan. It also indicates the number of shipment legs that satisfied selection criteria but for which the attach to current plan operation could not be successfully performed.