Use this page to create one skeleton load instance (with associated skeleton stops) from each selected skeleton route.
You can also specify whether Routing, Rating and Scheduling (RR&S) should be performed on newly created skeleton loads.
Note: Selected skeleton route status must be Active and the Load Scheduled Date must be between the skeleton route effective and expiration date values.