Set a booking to planned status (Employee)
Use the Set to Planned operation to change the booking status from Open to Planned.
Note: A booking must satisfy the following conditions to successfully perform this operation:
- Booking must be in Open status
 - Booking is not active for re-planning
 - Booking does not contain suspended loads
 - All loads that are associated to a booking must be in Open status and assigned to a plan
 
- Display the list of bookings (Employee).
 - Select the required bookings.
 - Click Set to Planned. If successful, the operational status of the bookings and associated loads is changed to Planned.