Load division matches division for the optimization request
The load is not currently attached to a plan, or is already attached to the plan for the optimization request
Optimization Request ID for load is not assigned
Load not currently engaged in carrier sequential tendering process
Scheduling for the load is enabled
Load is not currently suspended
Spot rate not defined for load
Stops exist for the load
Load has not overridden a hard commitment for an attached shipment leg
The operational status of the load is not Closed or Canceled.
If the operational status is Open, the global setting for open load composition selection applies:
If Exclude All Unapproved, the load approved flag must be true
If Include All Unapproved, the load approved flag may be true or false
If Exclude Unapproved Non-Skeleton, the load approved flag must be true or the load source is Skeleton Load
Planning status for the load is Picked, Packed or Locked (that is, not Free)
If planning status for the load is Picked or Packed, at least one of the following statements is true:
Load operational status is Open, Planned or Tender Rejected.
Load operational status is Tendered or Tender Accepted and carrier is configured to allow new shipments on load after tender
Continuation allowed flag for the load is true
Load includes at least one stop where the Dock Schedule Status is Required and not Computed and pick-up and/or delivery has yet to be reported
If planning status for the load is Locked, at least one of the following statements is true:
Load operational status is Open, Planned or Tender Rejected and one or more of carrier / service / equipment type are not hard committed (where hard committed flag is false and the corresponding number of committed shipment legs counter is zero)
Continuation allowed flag for the load is true
Load includes at least one stop where the Dock Schedule Status is Required and not Computed and pick-up and/or delivery has yet to be reported
If a dock commitment exists for one or more of the load’s stops, there are no applicable Dock Commitment Violations for these dock commitment(s).
Note: Loads will be updated with the applicable Optimizer Request ID when they are selected for re-planning. This ID will be removed when the optimization process completes. Loads will be unavailable for many functions in Transportation Manager while re-planning is active.