Unselect a shipment from optimization – Load Build Control (Employee)
Click Load Build > Work with Plan > Control. The Load Build Control screen is displayed.
Click Unselect under Optimization Operations. The Unselect Shipments for Optimization screen is displayed.
Enter the required information.
Click Submit. A message indicates the number of shipment legs that were successfully unselected for optimization and the number of shipment legs that satisfied selection criteria but for which the operation failed.