Set a shipment to planned status – Load Build Control (Employee)
Click Load Build > Work with Plan > Control. The Load Build Control screen is displayed.
Click Set To Planned under Shipment Leg Operations. The Set Shipments to Planned screen is displayed.
Enter the required information.
Click Submit. A message indicates the number of shipment legs that were successfully set to planned status and the number of shipment legs that satisfied selection criteria but for which the operation failed.