Set a shipment to planned status – Load Build Control (Employee)

  1. Click Load Build > Work with Plan > Control. The Load Build Control screen is displayed.
  2. Click Set To Planned under Shipment Leg Operations. The Set Shipments to Planned screen is displayed.
  3. Enter the required information.
  4. Click Submit. A message indicates the number of shipment legs that were successfully set to planned status and the number of shipment legs that satisfied selection criteria but for which the operation failed.

See Also

Set a shipment to planned status – List of Shipments (Employee)

Set shipments to planned status for manifests (Employee)

Set shipments to planned status via Manifest Control screen (Employee)

Set Shipments to Planned Status (Employee)